Projects / Hybrid PV and battery
Industries Programme
Hybrid PV and battery systems for 16 industrial enterprises in the Bekaa, funded by the European Union and implemented by ESFD with the Association of Lebanese Industrialists. 13 of the 16 sites are shown here.

- Client
- ESFD / ALI
- Consultant
- ELARD Group
- Programme capacity
- 212 kWp PV, 327 kWh storage
- Sites shown
- 13
- Year
- 2023
- Scope
- Design, supply, installation, testing and commissioning
About the programme
Industrial renewable energy infrastructure integrating solar PV and battery-backed hybrid systems for 16 industrial enterprises in the Bekaa, under a programme funded by the European Union and implemented by ESFD with the Association of Lebanese Industrialists.
The sites
Planning a similar project?
Send us your site details and an engineer will reply, Monday to Saturday, 8:00 to 17:00.
Tenders and institutional enquiries: info@sunforfreelb.com · Download our company profile (PDF, 4 MB)
What to send us
- Site location (map pin)
- Electricity bill or generator details
- Photos of the roof or the land
- Loads to be powered and operating hours













