Projects / PV–diesel hybrid

Berrad Al Mansoura

100 kWp PV–diesel hybrid system · Al Mansoura, Bekaa · Completed 2019

Rows across the metal roof
Client
Berrad Al Mansoura
Location
Al Mansoura, Bekaa
System
PV–diesel hybrid
PV capacity
100 kWp
Completed
2019

About the project

PV–diesel hybrid system for Berrad Al Mansoura cold storage in Al Mansoura. The 100 kWp rooftop array operates in parallel with the facility's diesel generators during daylight hours.

Planning a similar project?

Send us your site details and an engineer will reply, Monday to Saturday, 8:00 to 17:00.

Tenders and institutional enquiries: info@sunforfreelb.com · Download our company profile (PDF, 4 MB)

What to send us

  • Site location (map pin)
  • Electricity bill or generator details
  • Photos of the roof or the land
  • Loads to be powered and operating hours