Projects / Bekaa Water Establishment Solar Pumping Programme
Ablah Treatment Plant
50 kWp on-grid PV system · Ablah, Bekaa · Completed 2023

- Client
- CDR / ESFD / BWE (EU-funded)
- Location
- Ablah, Bekaa
- SUN FOR FREE's role
- Sub-contractor
- Consultant
- Libanconsult
- System
- On-grid PV
- PV capacity
- 50 kWp
- Completed
- 2023
About the project
50 kWp grid-connected solar array on an elevated structure at the Ablah treatment plant.
Part of the Bekaa Water Establishment Solar Pumping Programme (1.32 MWp).
Photos from the site
Other sites in this programme
Planning a similar project?
Send us your site details and an engineer will reply, Monday to Saturday, 8:00 to 17:00.
Tenders and institutional enquiries: info@sunforfreelb.com · Download our company profile (PDF, 4 MB)
What to send us
- Site location (map pin)
- Electricity bill or generator details
- Photos of the roof or the land
- Loads to be powered and operating hours








